Oxfordshire, UK
Agile Working Zone in Oxfordshire
SECTOR
Pharmaceuticals
LOCATION
PROJECT SIZE
DURATION

PROJECT overview
Establishing a flexible agile working zone spanning collaboration, meetings, desk work and laboratory space.
This project involved the complete remodelling of an existing office space to create an attractive, well-equipped zone where staff can move seamlessly between collaboration, meetings, desk work and private calls, with a flexible laboratory space included. Careful coordination with the client during detailed design and delivery was vital to the project's success.
50+
YEARS
400+
PROJECTS
9
SECTORS
THE CHALLENGE
A constrained, dated space that had to keep working around live operations
The project needed to be delivered with minimal disruption to the client's already-busy operation.
A dedicated site entrance separate to the client's usual building entrances had to be created via a temporary first-floor opening.
Specialist contractors needed careful coordination and supervision alongside the detail-orientated refurbishment and fit-out works.
OUR SOLUTION
Developing third-party concepts into a detailed, deliverable working design.
Glenside developed impressive third-party concept designs into a deliverable, detailed working design. Sustainable materials from local sources were used and re-used where possible, with waste materials recycled, while specialist acoustic products and construction methods supported quality working and conferencing environments.
Key points:
A detailed survey, technical CAD design and coordination of furniture designs across the space.
3D photo-realistic visuals, Building Control consultation and CDM Principal Designer responsibilities throughout delivery.