High Wycombe, UK
Warehouse Conversion in High Wycombe
SECTOR
Science & Research
LOCATION
PROJECT SIZE
DURATION

PROJECT overview
Converting an underused basement car park into technical production, testing and warehouse space.
The client had partially enclosed basement car park space that was significantly underused. Glenside's task was to enclose additional car park area to enlarge the building's footprint, creating new warehouse space while converting former warehouse areas into technical production space.
50+
YEARS
400+
PROJECTS
9
SECTORS
THE CHALLENGE
A constrained, dated space that had to keep working around live operations
The undercroft area had varied floor levels and low head height in places, requiring careful design solutions.
Planning authority approval was required before construction of the enlarged footprint could begin.
Works were carried out in a complex phased sequence to allow client operations to continue throughout.
OUR SOLUTION
A turnkey package delivered ahead of programme and on budget.
Glenside provided a complete turnkey package covering design, planning, survey, structural design, local authority approvals, cost management and site management planning. The project was delivered ahead of programme, on budget and with minimal impact on the client's ongoing operations.
Key points:
Groundworks, partitioning, ceilings and specialist floor coverings including ESD flooring throughout the new production areas.
Detailed mechanical and electrical installations, including compressed air, gas, fire and security system alterations.